INDIVIDUAL MCP TOOL
voltage_drop
Voltage drop for a given conductor size, current and one-way length, single- or three-phase, from NEC Chapter 9 Table 8 circular mils (VD = 2·K·I·L / CM, or √3 for three-phase).
LIVE ENDPOINT
https://sparkquote.ai/mcp
Connect to this endpoint to inspect the live schema for voltage_drop and invoke it with your own arguments.
Indexed input schema
{}Risk classification
Potential side effects detected · medium confidence · heuristic, not a guarantee.
- A tool name or description contains a deletion term.
Parent server
CONNECT WITH APPROVAL
Client installation
Review this server and its permissions before adding it. Secret placeholders must be set locally.
Codex
~/.codex/config.toml
[mcp_servers.sparkquote]
url = "https://sparkquote.ai/mcp"
enabled = true
Claude Code
.mcp.json
{
"mcpServers": {
"sparkquote": {
"type": "http",
"url": "https://sparkquote.ai/mcp"
}
}
}
Claude Desktop
Settings → Connectors → Add custom connector
Name: sparkquote
Remote MCP URL: https://sparkquote.ai/mcp
Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.
Cursor
.cursor/mcp.json
{
"mcpServers": {
"sparkquote": {
"url": "https://sparkquote.ai/mcp"
}
}
}
Visual Studio Code
.vscode/mcp.json
Add to Visual Studio Code{
"servers": {
"sparkquote": {
"type": "http",
"url": "https://sparkquote.ai/mcp"
}
}
}
Generic MCP
Client-specific MCP configuration
{
"name": "sparkquote",
"transport": "streamable-http",
"url": "https://sparkquote.ai/mcp"
}
MCP Inspector
Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.
Related tools
wire_size— Minimum conductor size for a circuit: NEC Table 310.watts_to_amps— Current drawn by a load in watts at a voltage and power factor, single- or three-phase, plus the 125% continuous-load value.conduit_fill— Percent fill and maximum number of THHN/THWN-2 conductors of one size in EMT or PVC Schedule 40, from NEC Chapter 9 Tables 1, 4 and 5.box_fill— Minimum outlet box volume from NEC 314.load_calculator— Dwelling service load by the NEC 220.ohms_law— Ohm's law and power: give exactly two of voltage, current, resistance and power; the other two are calculated.panel_schedule— Lays circuits out on a 120/240 V single-phase or 208Y/120 V three-phase panel and totals the load per phase with the imbalance.bid_calculator— Electrical bid price from materials, markup, labor hours and rate, job costs, overhead and a target net margin (price = break-even / (1 − margin)).