← atlasly.app
INDIVIDUAL MCP TOOL
get_planning_history
Fetch recent planning applications near a UK address from planning.data.gov.uk.
Input schema
{}Risk classification
Inferred read-only · medium confidence · heuristic, not a guarantee.
- A tool name or description suggests retrieving external content.
Parent endpoint
CONNECT WITH APPROVAL
Client installation
Review this server and its permissions before adding it. Secret placeholders must be set locally.
Codex
~/.codex/config.toml
[mcp_servers.atlasly-app]
url = "https://mcp.atlasly.app/mcp"
enabled = true
Claude Code
.mcp.json
{
"mcpServers": {
"atlasly-app": {
"type": "http",
"url": "https://mcp.atlasly.app/mcp"
}
}
}
Claude Desktop
Settings → Connectors → Add custom connector
Name: atlasly-app
Remote MCP URL: https://mcp.atlasly.app/mcp
Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.
Cursor
.cursor/mcp.json
{
"mcpServers": {
"atlasly-app": {
"url": "https://mcp.atlasly.app/mcp"
}
}
}
Visual Studio Code
.vscode/mcp.json
Add to Visual Studio Code{
"servers": {
"atlasly-app": {
"type": "http",
"url": "https://mcp.atlasly.app/mcp"
}
}
}
Generic MCP
Client-specific MCP configuration
{
"name": "atlasly-app",
"transport": "streamable-http",
"url": "https://mcp.atlasly.app/mcp"
}
MCP Inspector
Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.
Related tools
search_tools— Discover available Atlasly tools by keyword.get_lpa_adapter_status— Purpose: inspect Atlasly top-LPA planning source adapter coverage, operational status, cache state, record counts, and geometry coverage.analyze_site— First-pass site intelligence for a UK address or postcode.check_planning_constraints— Check first-pass UK planning constraints at a site: flood zone, listed buildings, conservation areas, Article 4 Directions, Tree Preservation Orders, environmental designations (SSSI, AONB, Green Belt, ancient woodland), historic landfill, and ground conditions.check_permitted_development— Purpose: decide whether a common UK proposal is likely permitted development, prior approval, full permission, or unclear by combining GPDO Schedule 2 logic with Atlasly site constraints.calculate_biodiversity_net_gain— Purpose: calculate a first-pass Biodiversity Net Gain baseline, post-development units, deficit, and offset requirement using the statutory metric area x distinctiveness x condition x strategic significance structure.get_local_plan_policies— Purpose: identify the LPA for a UK site and return adopted local plan policy extracts (paragraph-level, from Atlasly's ingested corpus of 250+ councils' development plans) plus national NPPF references for the requested development type.estimate_planning_costs— Purpose: estimate England planning application fees, CIL coverage/liability status, and likely S106 heads for early feasibility and viability checks.