INDIVIDUAL MCP TOOL
pcc_get_request_critical_path
Get the critical path (longest dependency chain) for a capability request.
LIVE ENDPOINT
https://capability.network/mcp
Connect to this endpoint to inspect the live schema for pcc_get_request_critical_path and invoke it with your own arguments.
Indexed input schema
{}Risk classification
Inferred read-only · medium confidence · heuristic, not a guarantee.
- No write-capable action terms were found; this is not proof that invocation has no side effects.
Parent server
CONNECT WITH APPROVAL
Client installation
Review this server and its permissions before adding it. Secret placeholders must be set locally.
Codex
~/.codex/config.toml
[mcp_servers.physical-capability-cloud]
url = "https://capability.network/mcp"
enabled = true
Claude Code
.mcp.json
{
"mcpServers": {
"physical-capability-cloud": {
"type": "http",
"url": "https://capability.network/mcp"
}
}
}
Claude Desktop
Settings → Connectors → Add custom connector
Name: physical-capability-cloud
Remote MCP URL: https://capability.network/mcp
Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.
Cursor
.cursor/mcp.json
{
"mcpServers": {
"physical-capability-cloud": {
"url": "https://capability.network/mcp"
}
}
}
Visual Studio Code
.vscode/mcp.json
Add to Visual Studio Code{
"servers": {
"physical-capability-cloud": {
"type": "http",
"url": "https://capability.network/mcp"
}
}
}
Generic MCP
Client-specific MCP configuration
{
"name": "physical-capability-cloud",
"transport": "streamable-http",
"url": "https://capability.network/mcp"
}
MCP Inspector
Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.
Related tools
provision_api_key— CALL THIS FIRST.list_api_keys— List all active API keys for the authenticated operator.revoke_api_key— Revoke an API key permanently.setup_detect— Auto-detect current setup state: env vars, database, adapters, chain connectivity, storage, identity.setup_generate_config— Generate a KERNEL_CONFIG JSON from device descriptions.setup_validate— Validate a kernel config (20+ checks: JSON structure, device connectivity, adapter compatibility).setup_register_device— Register a device in the database with adapter config and capabilities.setup_test_job— Submit a test job to verify the full pipeline works end-to-end (Step 4 of onboarding).