← novtriq.tech
INDIVIDUAL MCP TOOL
part_s_ev
UK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential.
Input schema
{}Risk classification
Potential side effects detected · medium confidence · heuristic, not a guarantee.
- A tool name or description suggests a financial action.
Parent endpoint
CONNECT WITH APPROVAL
Client installation
Review this server and its permissions before adding it. Secret placeholders must be set locally.
Codex
~/.codex/config.toml
[mcp_servers.novtriq-tech]
url = "https://api.novtriq.tech/mcp"
enabled = true
Claude Code
.mcp.json
{
"mcpServers": {
"novtriq-tech": {
"type": "http",
"url": "https://api.novtriq.tech/mcp"
}
}
}
Claude Desktop
Settings → Connectors → Add custom connector
Name: novtriq-tech
Remote MCP URL: https://api.novtriq.tech/mcp
Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.
Cursor
.cursor/mcp.json
{
"mcpServers": {
"novtriq-tech": {
"url": "https://api.novtriq.tech/mcp"
}
}
}
Visual Studio Code
.vscode/mcp.json
Add to Visual Studio Code{
"servers": {
"novtriq-tech": {
"type": "http",
"url": "https://api.novtriq.tech/mcp"
}
}
}
Generic MCP
Client-specific MCP configuration
{
"name": "novtriq-tech",
"transport": "streamable-http",
"url": "https://api.novtriq.tech/mcp"
}
MCP Inspector
Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.
Related tools
calculate_pue— Calculate Power Usage Effectiveness (PUE) for a data centre or server room.check_nis2_readiness— Assess NIS2 Directive (EU 2022/2555) compliance readiness.assess_epbd_score— Assess EU EPBD (2024) compliance.estimate_cooling_load— Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology.check_uae_bim_compliance— Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah).check_uae_cybersecurity— Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA).check_grid_feasibility_uae— Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA).get_technical_dd_quote— Generate an indicative Technical Due Diligence (TDD) fee estimate.