← 558686.xyz

INDIVIDUAL MCP TOOL

gpt55_x402_mcp_asset_inventory_risk_register

Premium MCP operations agent that returns tool inventory schema, risk register rows, decommission plan, owner matrix, receipt-scope catalog, and quarterly review cadence.

558686.xyznone authenticationAvailability not checked

LIVE ENDPOINT

https://gpt55.558686.xyz/mcp

No auth detected

Connect to this endpoint to inspect the live schema for gpt55_x402_mcp_asset_inventory_risk_register and invoke it with your own arguments.

Indexed input schema

{}

Risk classification

Inferred read-only · medium confidence · heuristic, not a guarantee.

  • No write-capable action terms were found; this is not proof that invocation has no side effects.

Parent server

558686.xyz

CONNECT WITH APPROVAL

Client installation

Review this server and its permissions before adding it. Secret placeholders must be set locally.

Codex

~/.codex/config.toml

[mcp_servers.gpt55-x402-gateway]
url = "https://gpt55.558686.xyz/mcp"
enabled = true
Claude Code

.mcp.json

{
  "mcpServers": {
    "gpt55-x402-gateway": {
      "type": "http",
      "url": "https://gpt55.558686.xyz/mcp"
    }
  }
}
Claude Desktop

Settings → Connectors → Add custom connector

Name: gpt55-x402-gateway
Remote MCP URL: https://gpt55.558686.xyz/mcp

Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.

Cursor

.cursor/mcp.json

{
  "mcpServers": {
    "gpt55-x402-gateway": {
      "url": "https://gpt55.558686.xyz/mcp"
    }
  }
}
Visual Studio Code

.vscode/mcp.json

Add to Visual Studio Code
{
  "servers": {
    "gpt55-x402-gateway": {
      "type": "http",
      "url": "https://gpt55.558686.xyz/mcp"
    }
  }
}
Generic MCP

Client-specific MCP configuration

{
  "name": "gpt55-x402-gateway",
  "transport": "streamable-http",
  "url": "https://gpt55.558686.xyz/mcp"
}
MCP Inspector

Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.

Related tools