← ouroborosapps.com

INDIVIDUAL MCP TOOL

file_change_order

Record a proposed change order.

ouroborosapps.comnone authenticationAvailability not checked

LIVE ENDPOINT

https://scope-continuity2.vercel.app/mcp

No auth detected

Connect to this endpoint to inspect the live schema for file_change_order and invoke it with your own arguments.

Indexed input schema

{}

Risk classification

Inferred read-only · medium confidence · heuristic, not a guarantee.

  • No write-capable action terms were found; this is not proof that invocation has no side effects.

Parent server

ouroborosapps.com

CONNECT WITH APPROVAL

Client installation

Review this server and its permissions before adding it. Secret placeholders must be set locally.

Codex

~/.codex/config.toml

[mcp_servers.scope]
url = "https://scope-continuity2.vercel.app/mcp"
enabled = true
Claude Code

.mcp.json

{
  "mcpServers": {
    "scope": {
      "type": "http",
      "url": "https://scope-continuity2.vercel.app/mcp"
    }
  }
}
Claude Desktop

Settings → Connectors → Add custom connector

Name: scope
Remote MCP URL: https://scope-continuity2.vercel.app/mcp

Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.

Cursor

.cursor/mcp.json

{
  "mcpServers": {
    "scope": {
      "url": "https://scope-continuity2.vercel.app/mcp"
    }
  }
}
Visual Studio Code

.vscode/mcp.json

Add to Visual Studio Code
{
  "servers": {
    "scope": {
      "type": "http",
      "url": "https://scope-continuity2.vercel.app/mcp"
    }
  }
}
Generic MCP

Client-specific MCP configuration

{
  "name": "scope",
  "transport": "streamable-http",
  "url": "https://scope-continuity2.vercel.app/mcp"
}
MCP Inspector

Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.

Related tools

  • list_engagements — List the signed-in freelancer's engagements.
  • create_engagement — Create a draft engagement.
  • get_approved_record — Read the approved scope, rates, deadlines, and change orders before answering.
  • save_scope_item — Add or update a scope item the freelancer has accepted.
  • save_rate — Set a draft rate, or update an approved rate without lowering it or changing its unit.
  • save_deadline — Set or move the deadline for one scope item.
  • approve_scope — Mark the current draft as the approved scope.
  • approve_change_order — Apply one proposed change order after the freelancer explicitly approves that order.