INDIVIDUAL MCP TOOL
contractor_foreman_create_change_order
Create change order in the user's own Contractor Foreman account from ChatGPT, Claude or any AI agent.
LIVE ENDPOINT
https://cotlet.dev/mcp/v1/contractor-foreman
Connect to this endpoint to inspect the live schema for contractor_foreman_create_change_order and invoke it with your own arguments.
Indexed input schema
{}Risk classification
Potential side effects detected · medium confidence · heuristic, not a guarantee.
- A tool name or description contains a write-action term.
Parent server
CONNECT WITH APPROVAL
Client installation
Review this server and its permissions before adding it. Secret placeholders must be set locally.
Codex
~/.codex/config.toml
[mcp_servers.cotlet-contractor-foreman]
url = "https://cotlet.dev/mcp/v1/contractor-foreman"
enabled = true
Claude Code
.mcp.json
{
"mcpServers": {
"cotlet-contractor-foreman": {
"type": "http",
"url": "https://cotlet.dev/mcp/v1/contractor-foreman"
}
}
}
Claude Desktop
Settings → Connectors → Add custom connector
Name: cotlet-contractor-foreman
Remote MCP URL: https://cotlet.dev/mcp/v1/contractor-foreman
Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.
Cursor
.cursor/mcp.json
{
"mcpServers": {
"cotlet-contractor-foreman": {
"url": "https://cotlet.dev/mcp/v1/contractor-foreman"
}
}
}
Visual Studio Code
.vscode/mcp.json
Add to Visual Studio Code{
"servers": {
"cotlet-contractor-foreman": {
"type": "http",
"url": "https://cotlet.dev/mcp/v1/contractor-foreman"
}
}
}
Generic MCP
Client-specific MCP configuration
{
"name": "cotlet-contractor-foreman",
"transport": "streamable-http",
"url": "https://cotlet.dev/mcp/v1/contractor-foreman"
}
MCP Inspector
Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.
Related tools
cotlet_whoami— The Cotlet account this connection acts as: email, workspace, access status, the API key or OAuth client in use with its scope, the apps the workspace may call, its credit balance, and the app the user signed up for with its first task and sign-in link.cotlet_apps— The apps of the user's workspace and whether each works now: the app account in the user's Cloud Browser (connected, signed out, signed in but not connected), and the one step the user has to take, with the console link.cotlet_balance— The user's current credit balance.cotlet_refresh_button— Shows the user a button that refreshes Cotlet in their AI app.cotlet_get_call— Status of an earlier Cotlet call, by its call_id: pending (waits for the owner's approval in the Cotlet console), approved, running, success, rejected, expired, blocked or failed.cotlet_upload_file— Returns a one-time upload_url and a file_id for a local file (an image for a post, an attachment).cotlet_report_issue— Sends a report to the Cotlet team: a tool that failed or returned wrong data, an error you could not get past, or a step the browser could not do, with the page, the step and what you saw.cotlet_browser_open— Starts the user's Cloud Browser (a real Chrome on Cotlet, where the user is signed in to their sites) and opens `url`.