← zovo.one

INDIVIDUAL MCP TOOL

check_wbs

Use this when the user wants a WBS outline or numbered task list checked without a chart, for example "check my WBS codes for gaps" or "do the costs in this breakdown add up".

zovo.onenone authenticationAvailability not checked

LIVE ENDPOINT

https://wbs-chart.zovo.one/mcp

No auth detected

Connect to this endpoint to inspect the live schema for check_wbs and invoke it with your own arguments.

Indexed input schema

{}

Risk classification

Inferred read-only · medium confidence · heuristic, not a guarantee.

  • No write-capable action terms were found; this is not proof that invocation has no side effects.

Parent server

zovo.one

CONNECT WITH APPROVAL

Client installation

Review this server and its permissions before adding it. Secret placeholders must be set locally.

Codex

~/.codex/config.toml

[mcp_servers.wbs-chart]
url = "https://wbs-chart.zovo.one/mcp"
enabled = true
Claude Code

.mcp.json

{
  "mcpServers": {
    "wbs-chart": {
      "type": "http",
      "url": "https://wbs-chart.zovo.one/mcp"
    }
  }
}
Claude Desktop

Settings → Connectors → Add custom connector

Name: wbs-chart
Remote MCP URL: https://wbs-chart.zovo.one/mcp

Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.

Cursor

.cursor/mcp.json

{
  "mcpServers": {
    "wbs-chart": {
      "url": "https://wbs-chart.zovo.one/mcp"
    }
  }
}
Visual Studio Code

.vscode/mcp.json

Add to Visual Studio Code
{
  "servers": {
    "wbs-chart": {
      "type": "http",
      "url": "https://wbs-chart.zovo.one/mcp"
    }
  }
}
Generic MCP

Client-specific MCP configuration

{
  "name": "wbs-chart",
  "transport": "streamable-http",
  "url": "https://wbs-chart.zovo.one/mcp"
}
MCP Inspector

Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.

Related tools

  • make_wbs — Use this when the user wants a work breakdown structure (WBS) chart or a project breakdown drawn from an outline, for example "make a WBS chart of this project" or "turn this task list into a WBS with codes and cost totals".