← landbng.uk

INDIVIDUAL MCP TOOL

check_grid_connection

Check nearest UK electricity Distribution Network Operator (DNO) grid connection headroom for a location: generation/demand headroom (MW/MVA), RAG status, voltage, and a combined BNG+grid siting signal.

landbng.uknone authenticationAvailability not checked

LIVE ENDPOINT

https://landbng.uk/mcp

No auth detected

Connect to this endpoint to inspect the live schema for check_grid_connection and invoke it with your own arguments.

Indexed input schema

{}

Risk classification

Inferred read-only · medium confidence · heuristic, not a guarantee.

  • No write-capable action terms were found; this is not proof that invocation has no side effects.

Parent server

landbng.uk

CONNECT WITH APPROVAL

Client installation

Review this server and its permissions before adding it. Secret placeholders must be set locally.

Codex

~/.codex/config.toml

[mcp_servers.landbng]
url = "https://landbng.uk/mcp"
enabled = true
Claude Code

.mcp.json

{
  "mcpServers": {
    "landbng": {
      "type": "http",
      "url": "https://landbng.uk/mcp"
    }
  }
}
Claude Desktop

Settings → Connectors → Add custom connector

Name: landbng
Remote MCP URL: https://landbng.uk/mcp

Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.

Cursor

.cursor/mcp.json

{
  "mcpServers": {
    "landbng": {
      "url": "https://landbng.uk/mcp"
    }
  }
}
Visual Studio Code

.vscode/mcp.json

Add to Visual Studio Code
{
  "servers": {
    "landbng": {
      "type": "http",
      "url": "https://landbng.uk/mcp"
    }
  }
}
Generic MCP

Client-specific MCP configuration

{
  "name": "landbng",
  "transport": "streamable-http",
  "url": "https://landbng.uk/mcp"
}
MCP Inspector

Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.

Related tools

  • check_planning_history — Find planning applications near a UK location, via UK PlanIt's public aggregator (over 400 UK planning authorities).
  • estimate_bng_income — Estimate 30-year lump-sum BNG income (LOW/MID/HIGH) for dedicating `area_ha` hectares of an England parcel to biodiversity net gain habitat creation, from LandBNG planning assumptions per habitat capped at the Defra statutory credit price; local factors (flood zone, SSSI, Green Belt, Ancient Woodland, AONB, Agricultural Land Class, nearby NSIP projects and how many fall under mandatory BNG) are listed, not priced.
  • estimate_bng_cost — Estimate the cost of meeting England's mandatory 10% biodiversity net gain requirement for a development scheme of `scheme_ha` hectares, across 3 procurement routes (off-site habitat bank mosaic, off-site grassland/ heathland, statutory biodiversity credits, priced per unit at two Defra credits per unit), and the units to buy from a gain site in the same, a neighbouring or a further authority (spatial risk multiplier 1.