← x402vip.com

INDIVIDUAL MCP TOOL

ai_risk_register

Creates a risk register with likelihood, impact, mitigation, owner, triggers, and monitoring signals.

x402vip.comnone authenticationAvailability not checked

LIVE ENDPOINT

https://x402vip.com/mcp

No auth detected

Connect to this endpoint to inspect the live schema for ai_risk_register and invoke it with your own arguments.

Indexed input schema

{}

Risk classification

Inferred read-only · medium confidence · heuristic, not a guarantee.

  • No write-capable action terms were found; this is not proof that invocation has no side effects.

Parent server

x402vip.com

CONNECT WITH APPROVAL

Client installation

Review this server and its permissions before adding it. Secret placeholders must be set locally.

Codex

~/.codex/config.toml

[mcp_servers.server402]
url = "https://x402vip.com/mcp"
enabled = true
Claude Code

.mcp.json

{
  "mcpServers": {
    "server402": {
      "type": "http",
      "url": "https://x402vip.com/mcp"
    }
  }
}
Claude Desktop

Settings → Connectors → Add custom connector

Name: server402
Remote MCP URL: https://x402vip.com/mcp

Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.

Cursor

.cursor/mcp.json

{
  "mcpServers": {
    "server402": {
      "url": "https://x402vip.com/mcp"
    }
  }
}
Visual Studio Code

.vscode/mcp.json

Add to Visual Studio Code
{
  "servers": {
    "server402": {
      "type": "http",
      "url": "https://x402vip.com/mcp"
    }
  }
}
Generic MCP

Client-specific MCP configuration

{
  "name": "server402",
  "transport": "streamable-http",
  "url": "https://x402vip.com/mcp"
}
MCP Inspector

Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.

Related tools

  • word_count — Count Unicode characters, whitespace-delimited words, and lines in a text string.
  • slugify — Convert an English title into a lowercase URL-safe slug.
  • timestamp — Return the current server time in UTC RFC3339 format and Unix seconds.
  • proxy_health — 通过 backendUrl 转发到真实服务的付费代理示例。 Price: XIAO 0.03.
  • random_uuid — Generate a random UUID by calling a third-party HTTP API.
  • hk_weather — Get current weather in Hong Kong, including temperature, relative humidity, and wind speed, from Open-Meteo.
  • multilingual_ocr — Recognize printed text from a public image URL.
  • aliyun_docmind_trade_package_extract — Submit a Trade Document Package extraction job to Alibaba Cloud Document Mind from a public file URL.