← Registry

General Tools

elec-mate.com

Provides lookups and calculations for UK electrical standards (BS 7671) for professionals.

1 endpoint22 known toolsFirst detected May 22, 2026Last detected June 25, 2026

ENDPOINT 1

https://www.elec-mate.com/api/public/v1/mcp

No auth detected

Known tools 22

bs7671_lookup_regulation

Fetch the full text of a specific BS 7671:2018+A4:2026 regulation by its number (e.g.

bs7671_lookup_table

Fetch a BS 7671:2018+A4:2026 table by number (e.g.

bs7671_search

Search Elec-Mate's canonical UK electrical content store — 46k+ verified chunks across BS 7671:2018+A4:2026 + IET Guidance Note 3 (9th Ed) + IET On-Site Guide (9th Ed).

calculate_zs_max

Calculate the maximum permitted earth fault loop impedance (Zs) for an MCB per BS 7671:2018+A4:2026 Reg 411.4.4.

calculate_disconnection_time

Maximum permitted disconnection time per BS 7671:2018+A4:2026 Table 41.1.

calculate_voltage_drop

Voltage drop calculation per BS 7671:2018+A4:2026 Appendix 4 Tables 4D1A/4D1B.

pwi_install_time

Typical labour time for a UK electrical job — aggregated from Elec-Mate's verified UK electrical data dataset (199k+ UK electrical records).

pwi_common_defects

Most-frequent defects an inspector finds in a category — sourced from Elec-Mate's verified UK electrical data.

pwi_eicr_codes

EICR observation codes (C1/C2/C3/FI) typically applied to faults in this category.

pwi_troubleshooting

Step-by-step troubleshooting + diagnostic test sequence for a category, aggregated from UK fault-finding records.

pwi_materials

Materials + tools typically required for a UK electrical job in this category.

pricing_job

Verified UK pricing for an electrical job — avg/min/max GBP by region.

eicr_code_explained

Returns the IET Best Practice Guide 4 definition of an EICR classification code: meaning, action required, EICR outcome impact, typical examples.

bs7671_lookup_section

Returns every BS 7671:2018+A4:2026 regulation in a specific section (e.g.

pwi_inspection_checklist

Visual inspection points + structured inspection checklist for an EICR or initial verification, aggregated from real UK inspection records.

pwi_installation_procedure

Installation method + fixing intervals + cable routes + termination methods + test procedures for a UK electrical job — aggregated from real UK installation records.

pwi_semantic_search

Free-text hybrid search across 199k+ verified UK electrical install/maintenance records (Elec-Mate's labour-intelligence corpus).

pwi_job_pack

Complete job profile in one call — aggregated across the top matching practical-work records.

calculate_earth_rod_resistance

Maximum permitted earth electrode resistance (Ra) for a TT system per BS 7671 Reg 411.5.3 (Ra × IΔn ≤ 50V).

notifiable_work_check

Returns whether the electrical work is notifiable under Part P of the Building Regulations (England).

certificate_required

Returns which BS 7671 certificate is required for a category of electrical work in the UK (EIC, Minor Works, EICR, PAT, etc.).

calculate_cable_size

Recommends a minimum cable size (mm² copper twin & earth, 70°C thermoplastic) per BS 7671:2018+A4:2026 Appendix 4.