← Registry

Design

calderflow.com

Creates presentation-ready flowcharts, chevron, funnel, lifecycle, and timeline diagrams from structured input.

1 endpoint10 known toolsFirst detected November 15, 2026Last detected November 15, 2026

ENDPOINT 1

https://www.calderflow.com/mcp

No auth detected

MCP server metadata

Name
calderflow
Version
0.1.0
Capabilities
toolsresources
Server instructions

CalderFlow turns structured specs into presentation-ready diagrams. Create charts with the create_* tools; every response includes a share URL that renders the live chart and opens in the CalderFlow editor. Use get_chart → edit_chart to revise. Prefer surgical tool_calls over full rewrites. AUTHORING GUIDE — calibrate detail to the ask: - Vague or ideation-stage request ('map the login flow', 'sketch our onboarding'): go HIGH LEVEL. 4-7 nodes, the happy path plus at most 2 essential decisions, no subgraphs. Consolidate checks that lead to the same outcome and offer a separate detail chart afterward. - Presentation density: keep one chart at 18 nodes or fewer. For a larger spec, create an overview first and split dense implementation branches into a follow-up detail chart. - Detailed request (a spec/PRD was provided, or the user says comprehensive/all edge cases): use subgraphs as phases, but keep each subgraph to 7 nodes or fewer and the whole chart at 18 nodes or fewer. Beyond that, split into multiple charts (one per phase) and say so. - Subgraph completeness: if a flowchart uses any subgraph, put every node exactly once inside a phase—including start, end, error, retry, and success/failure nodes. Keep same-phase edges inside that subgraph and cross-phase edges outside. Never leave boundary nodes homeless at top level. - Labels: 1-4 words per node; label every decision branch (Yes/No, or the option name). Put detail in edge labels and node text only when the user asked for it. - Flowchart icons and key step: give every node an icon with a `%% nodeIcon <nodeId> <icon>` line after the flowchart line (names: user, users, user-plus, user-check, log-in, log-out, lock, unlock, key, shield-check, fingerprint, mail, send, message-square, bell, phone, building-2, briefcase, landmark, store, credit-card, wallet, receipt, dollar-sign, shopping-cart, package, truck, gift, check-circle, x-circle, alert-triangle, info, help-circle, ban, clock, calendar, timer, hourglass, file-text, clipboard-check, file-signature, book-open, folder, database, server, cloud, code, git-branch, git-merge, terminal, cpu, bug, settings, sliders-horizontal, search, filter, eye, upload, download, refresh-cw, repeat, link, share-2, rocket, flag, target, trophy, star, thumbs-up, heart, sparkles, zap, bar-chart-3, trending-up, trending-down, pie-chart, activity, layout-dashboard, home, globe, map-pin, smartphone, monitor, list-checks, layers, inbox, archive, handshake, lightbulb, megaphone, graduation-cap), and mark the one step to remember with `class <nodeId> keyStep` (one per chart, 4+ nodes). Edit them later with set_node_icon / set_key_step. - Process, funnel, timeline and lifecycle charts: give every step, stage, event or milestone an icon field and set key: true on the one item to remember (4+ items). Edit them with set_item_icon / set_key_item. Icons and the key item show in Polished Presentation; Full stays plain. - Iterating: NEVER recreate a chart to change part of it — use edit_chart. The user may have hand-arranged the layout; edits preserve it, recreation destroys it. - Users describe a communication goal, not usually a chart name. Infer the visual grammar from the relationships; do not default to flowchart because they say process, journey, roadmap, or milestones. - Pick in this order: entities/tables + relationships → create_erd_chart; dates/deadlines/history → create_timeline_chart; shrinking counts/filtering/conversion → create_funnel_chart; decisions/branches/dependencies/interacting systems → create_flowchart; a level such as adoption, health, or intensity rising/falling across phases → create_lifecycle_chart; otherwise ordered equal-weight steps → create_chevron_chart. Apply this to the relationship being emphasized: incidental dates or counts do not override the intended visual story. - Ambiguous nouns need context: a sequential customer journey → chevron, but changing engagement across that journey → lifecycle; a dated roadmap → timeline, but undated strategic phases → chevron. - When Timeline is selected or explicitly requested, every event needs a marker in its date field. Preserve supplied dates/times. Use relative time for proposed plans and disclose estimates; use Phase 1, Phase 2, etc. for undated processes/conversions, not invented factual dates or measured durations. Use one consistent system, with TBD for unknown dates in an otherwise dated chart. Retain concise descriptions in both Full and Presentation. - Timeline markers belong in each event's date field, never a missing-timing warning or instructional footer. Do not leave all markers blank; use ordinal phases when timing is unspecified. - Chevron descriptions: put real line breaks before and after structured labels such as **Goal:**, **KPI:**, and *Success signals:*; do not bury those labels inside a paragraph.

Known tools 10

create_flowchart

Create a presentation-ready flowchart or architecture diagram from Mermaid source.

Potential side effects
create_chevron_chart

Create a sequential/chevron chart: a linear sequence of steps, phases, or stages (e.

Potential side effects
create_funnel_chart

Create a funnel chart for filtering/narrowing processes where quantities reduce per stage (conversion funnels, pipelines).

Potential side effects
create_lifecycle_chart

Create a lifecycle chart: phases across the top and milestones plotted on a curve.

Potential side effects
create_timeline_chart

Create a timeline of events in chronological order (roadmaps, company history, sprint/release schedules).

Potential side effects
create_erd_chart

Create an entity-relationship diagram (database schema / data model) with typed fields, PK/FK markers, and crow's-foot relationships.

Potential side effects
edit_chart

Edit an existing chart.

Potential side effects
get_chart

Fetch a chart's current spec (JSON) and editable source text, plus its share URL.

Inferred read-only
list_charts

List your CalderFlow charts (id, title, type, share URL), newest first.

Inferred read-only
delete_chart

Permanently delete a chart you own.

Potential side effects

CONNECT WITH APPROVAL

Client installation

Review this server and its permissions before adding it. Secret placeholders must be set locally.

Codex

~/.codex/config.toml

[mcp_servers.calderflow]
url = "https://www.calderflow.com/mcp"
enabled = true
Claude Code

.mcp.json

{
  "mcpServers": {
    "calderflow": {
      "type": "http",
      "url": "https://www.calderflow.com/mcp"
    }
  }
}
Claude Desktop

Settings → Connectors → Add custom connector

Name: calderflow
Remote MCP URL: https://www.calderflow.com/mcp

Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.

Cursor

.cursor/mcp.json

{
  "mcpServers": {
    "calderflow": {
      "url": "https://www.calderflow.com/mcp"
    }
  }
}
Visual Studio Code

.vscode/mcp.json

Add to Visual Studio Code
{
  "servers": {
    "calderflow": {
      "type": "http",
      "url": "https://www.calderflow.com/mcp"
    }
  }
}
Generic MCP

Client-specific MCP configuration

{
  "name": "calderflow",
  "transport": "streamable-http",
  "url": "https://www.calderflow.com/mcp"
}
MCP Inspector

Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.

TRUST AND VERIFICATION EVIDENCE

Trust Data Available

BuiltWith Trust API v2 evidence for calderflow.com was fetched 2026-11-17T20:12:39.967Z.

Trust status Neutral

calderflow.com is assessed as Neutral: No suspicious signals found, but no strong positive signal either

Indexed

Evidence is source-attributed and does not guarantee that a third-party server is safe. Risk labels are conservative metadata heuristics.